Home | About us | Career | Contact us
   1-647-352-8000
Specializes in delivering Carbon Emission Reduction Technologies to a global marketplace

International



TOWELLER TEXTILE MILL, KARACHI, PAKISTAN – VENTILATION SYSTEM POWER HOUSE.

Facility
lndustry

Client
Quality Air System.

Notable Features
Energy Efficient Ventilation System For Power House.

Project Success
ABS Design & Engineering entire
energy efficient Ventilation System


Quality Air System provided Turnkey-Ventilation System for this power house. For power house high temperature issues, we recommend a unique and state of the art ventilation system which resolve this problem and maintain comfort level for operators.

Project Feature Construction Photography
Full Article
 

DOLLARS INDUSTRIES (PVT) LTD, KARACHI, PAKISTAN

Facility
lndustry

Client
Quality Air System.

Notable Features
Energy Efficient Humidification
SystemOf Grinding Fiber rods
department.




Project Success
ABS Design & Engineering entire energy efficient
Humidification System


Quality Air System provided Turnkey-Humidification System including highly efficient propeller fans, efficient spray nozzle system and efficient automatic dust collection systems to minimize the operating costs which ultimately reduce energy bills.

Project Feature Construction Photography
Full Article
 

HANTEX DENIM, KARACHI, PAKISTAN

Facility
lndustry

Client
Quality Air System.

Notable Features
Energy Efficient Humidification
System of ball warping department.



Project Success
ABS Design & Engineering entire
energy efficient Humidification
System.



Quality Air System provided Turnkey-Humidification System including two Air washers (Spray) equipment is used to maintained 85oF temperature with 72% relative humidity in the department. Saturation efficiency of air washers is 95% to maintain 72% relative humidity.

Project Feature Construction Photography
Full Article
 

HANTEX DENIM, KARACHI, PAKISTAN

Facility
lndustry

Client
Quality Air System.

Notable Features
Energy Efficient Humidification
System of ball warping department.



Project Success
ABS Design & Engineering entire
energy efficient Humidification
System.



Quality Air System provided Turnkey-Humidification System including two Air washers (Spray) equipment is used to maintained 85oF temperature with 72% relative humidity in the department. The air changes of the department are 40/hr based on local environment conditions, building materials R-Values & other factors.

Project Feature Construction Photography
Full Article